View Single Post
  #94  
Old 02-23-2019
Kiwi3's Avatar
Kiwi3 Kiwi3 is offline
Senior Member
 
Join Date: Dec 2015
Location: Dothan
Posts: 1,008
Default

I was doing the math for the Charge Controller AMPs and decided that I'm going to do the battery packs as phase 1, then I'll look at adding more panels. I currently have a 40W controller which would allow me to use about 400-450 W of solar before needing a second charge controller or a larger one. Just one of those 12v vs 24v problems.

My thinking is swapping to Lithium will allow me to have more Watt Hours for less weight and I can recharge them much faster (less time on the gen). All wins for any situation. Then later I can deal with building the roof racks and put about 900-1200W of panels and a Midnite charge controller in as an alternative charging method. That would leave my old system to become the engine starting battery trickle charger.
__________________
Bruce & Marion Griffin
Dothan, AL
1994 Wide Body #106048 "Going Galt"
bruce.griffin67@gmail.com
334-350-8564
Blue Bird Map
Reply With Quote